DIgSILENT

News

July 13, 2016

ENTSO-E awards CGMES conformity for PowerFactory

The European Network of Transmission System Operators for Electricity (ENTSO-E) attests conformity of PowerFactory software with the requirements of the Common Grid Model Exchange Standard (CGMES). This attestation is valid for both PowerFactory 15.2 (service pack 15.2.8 ff), as well as PowerFactory 2016 (service pack SP1 ff).

DIgSILENT has successfully passed all relevant tests in the Conformity Assessment process and obtained Gold status in all applicable categories.

The Attestations of Conformity can be downloaded from here: PowerFactory 15.2, PowerFactory 2016.

For further information on the Common Information Model (CIM) as well as details on the CGMES conformity, please refer to the corresponding site of ENTSO-E.

CIM Import/Export functionality can be licensed as a module of the PowerFactory software.

Back to News