Connection Request Assessment

The assessment of connection requests is simplified with this dedicated tool, which supports the D-A-CH-CZ, BDEW and VDE-AR-N 4105/4100/4110 guidelines. The input to the Connection Request Command is a Connection Request element, configured according to the supplied data. The output report shows results such as voltage changes, flicker and harmonics and verifies the compliance with the selected guideline.

  • According to:
    • D-A-CH-CZ guidelines Editions 2 and 3
    • BDEW 2008, 4th supplement
    • VDE-AR-N 4105 guidelines (2011 and 2018)
    • VDE-AR-N 4100 guidelines (2018 and 2023)
  • Assessment of:
    • Voltage changes and flicker
    • Voltage imbalance
    • Loadings and short-circuit currents
    • Harmonics, interharmonics, audio-frequency ripple control
    • Commutation notches
    • Interharmonic voltages
    • HV resonances
PowerFactory