How can I setup an under frequency load shedding (UFLS) scheme?

Category:
Protection
Answer

This example shows a simple under frequency load shedding scheme (UFLS) in the 39 Bus New England System for the loads at buses 16, 21 and 23 in response to a disconnection of the G 06 generator.

Further explanation is provided in the attached document and the PowerFactory 2020 file is provided for reference.

Back